Blade Master: How Cyberhawk Inspected Griffin Wind Farm in Record Time

11 Jan 2022

Cyberhawk recently carried out internal blade inspections at Griffin Wind Farm in Perthshire. Spread across 6km, we assessed 61 turbines, each with three

Meet Sasha: Our Inspection Engineer On Adventure's Trail

02 Dec 2021

For those that know Sasha, it would perhaps seem inevitable that he would end up in a role such as the one he occupies at Cyberhawk. Raised on clean

CYBERHAWK MEETS CHANCELLOR OF THE EXCHEQUER, RISHI SUNAK

30 Jul 2021

Yesterday at the Levenmouth Demonstration Turbine, off the coast of Fife, Cyberhawk COO Phil Buchan met with Chancellor of the Exchequer, Rishi Sunak.

Drone inspection in an ever-evolving energy landscape

12 Nov 2020

We recently spoke to Cyberhawk CEO, Chris Fleming, to capture his thoughts on the latest developments in drone-based inspection across the energy industry

A New Revolution: A Pragmatic Approach to Blade Intelligence & Health

22 Oct 2019

As seen in Wind Energy Network magazine.

As turbines continue to deliver a greater percentage energy generation capacity, a pragmatic approach to blade